[Quarterly Goal Epic] Standardize workshop process #8484

@GeorgianaElena

Description

@GeorgianaElena

Context

In the light of the past workshop experiences where we've either:

  • did good without tempering much with the infra
  • had outages
  • went above and beyond with last minute changes

The time to standardize our practices has come and luckily, it fits under the O2: Reduce the toil associated with bespoke infrastructure for each community quarterly goal umbrella.

What we need to do

  • New team process — use the workshop GitHub card as a source of truth for requests and also what for what we did
  • Capture what was the list of things we had to think through during the past cirhoh workshop (conference) (it can be unstructured free-form)
  • From this list, gather the actions we did that:
    • can be applied to other workshops that we supported in the past or we know we have to support in the future
    • are sustainable from a capacity point of view
  • Once there's agreement, we can start documenting there so that any infra engineer can perform them and any engineer knows what we've changed in case something catches fire
  • Since resource allocation is at the heart of it, we need an easier way to do quick updates to the profile options when/if increasing the machine type
  • Document the new workshop specific dashboards
  • Empower the communities to run a dry run of their workshop materials on the infrastructure while we observe their needs
    • docs to support them
    • docs to support us

Definition of Done

  • A more coherent workshop prep process exists that's good enough to test it on a new workshop
  • All engineers are aware of it

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type
    No fields configured for issues without a type.

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions