Skip to content

Fix issue 422

Fix issue 422 #169

Triggered via push January 26, 2026 02:31
Status Failure
Total duration 2m 30s
Artifacts

bloom.yml

on: push
Matrix: build_linux
Fit to window
Zoom out
Zoom in

Annotations

5 errors
Ubuntu (jazzy)
Process completed with exit code 2.
Ubuntu (noetic)
The strategy configuration was canceled because "build_linux.ubuntu_24_04_jazzy" failed
Ubuntu (noetic)
The operation was canceled.
Ubuntu (humble)
The strategy configuration was canceled because "build_linux.ubuntu_24_04_jazzy" failed
Ubuntu (humble)
The operation was canceled.