Engineering Process for Product Requirements Documents and Design Documents

  • Owner: @just-mitch
  • Approvers:
    • Product: @joeandrews, @iAmMichaelConnor, @aminsammara, @0xrafi, @rahul-kothari
    • Engineering: @charlielye, @LHerskind, @dbanks12, @PhilWindle, @nventuro, @Rumata888
    • DevRel: @critesjosh
  • Target PRD Approval Date: 2025-03-14

Key words

The key words "MUST", "MUST NOT", "REQUIRED", "SHALL", "SHALL NOT", "SHOULD", "SHOULD NOT", "RECOMMENDED", "MAY", and "OPTIONAL" in this document are to be interpreted as described in RFC 2119.

Introduction

  • "Complex work" by engineering MUST have a Design Document (DD).
  • Determining whether work is "complex" is the responsibility of engineering team leads and product managers. Good candidates include:
    • Introduces new concepts, data structures, algorithms, services, or contracts
    • Interface or protocol changes
    • Affects multiple products or users (including internal and external)
    • Major refactoring or restructuring of code
  • Sometimes, the work prescribed by a DD is large (e.g. it takes over a week of engineering hours to fully build and test), or there are several interrelated designs that all pertain to a single "chunk of work" or "epic" or "product" (e.g. sequencer selection).
    • In these cases, the DD SHOULD have an associated Project Requirements Document (PRD).
    • If the DD does not have an associated PRD, it MUST articulate the basic requirements for the work.
  • If the requirements for a project/product are not clear, and engineering cannot quickly work out the requirements with the product/project owner, engineering SHOULD ask for a PRD to be created.
  • PRDs and DDs MUST be kept up to date via pull requests.
    • Note, making first drafts in other platforms (e.g. Google Docs or hackmd) is encouraged for rapid iteration.
  • Changes to the requirements in a PRD require re-approval by the individuals or groups specified in the original PRD.
  • Changes to the design which affect its compliance with the PRD MUST be re-approved by the individuals or groups specified in the original PRD.

Project Requirements Document (PRD)

The purpose of a PRD is to describe what is being built, why, for whom, and when it is needed.

It avoids describing how the work will be done, though it MAY provide guidance or opinions.

In a nutshell, it should tell the reader "Users segment X wants to be able to Y1, Y2, and Y3. We know this because Z. Here are the requirements for X to get Y. We need to deliver this by D."

  • A PRD MUST be created as a pull request.
  • A PRD MUST be a single document in a new directory in the docs directory.
    • For example, if the project is called cool-user-flow, the PRD should be in docs/cool-user-flow/prd.md.
    • A PRD MUST be written in markdown.
  • A PRD MUST identify:
    • The project name
    • The person responsible for the project
    • Any individuals or groups that must approve the PRD.
      • This MUST include
        • someone on product
        • an engineering team lead
        • a devrel engineer if the project touches external stakeholders
      • This MAY include
        • someone from the legal team
        • someone from the finance team
        • someone from the sales team
    • The PRD's target approval date
    • The delivery deadline for the project
    • The main user stories the project is intended to support
    • Whether and how demand for those user stories has been validated
    • Requirements describing the desired functionality/qualities in RFC 2119 terms
    • Each requirement SHOULD identify:
      • Why the requirement exists
      • Where the requirement comes from (e.g. what user is asking for it, or other observation inspired the requirement)
      • The KPIs and target values that candidate solutions will be measured against
    • Each requirement MAY:
      • Give guidance on how the requirement may change beyond the delivery deadline
  • The PRD SHOULD:
    • Define any key terms used in the requirements
    • Include a list of assumptions made in creating the requirements
    • Include a list of dependencies on other requirements
    • Include commentary on where the ideal candidate solution should sit in a tradeoff space, to give guidance how different candidate solutions will be compared. For example, stating that between two candidate solutions, the one that has the lower "cost measured in X" will be preferred.
  • Once all required approvals have been received, the PRD SHOULD be merged within 72 hours.

Design Document (DD)

The purpose of a DD is to describe how the work will be done.

  • A DD MUST be created as a pull request.
  • A DD MUST be a single document in a new directory in the docs directory.
    • For example, if the project is called my-project, the DD SHOULD be in docs/my-project/dd.md.
    • A DD MUST be written in markdown.
  • A DD MUST identify:
    • The PRD (including the commit hash) that the DD supports (if applicable)
    • A title/name for the design
    • The design approach
    • The key architecture decisions
    • Alternatives considered and why they were not chosen
    • How the design is expected to perform against the requirements in the PRD
    • A lead engineer for the project
    • A target completion date for the project
    • Any individuals or groups that must approve the DD.
      • This MUST include
        • at least 1 engineer on the same team as the lead engineer (MUST be the team lead if the team lead is not the lead engineer)
        • 1 engineer from each other team that is significantly impacted by the project
        • the product manager responsible for the project
      • This SHOULD include
        • individuals outside of product/engineering that approved the PRD
    • The DD's target approval date
  • A DD SHOULD identify:
    • assumptions/trade-offs made in creating the design
    • dependencies on other documents
    • a test plan for the project
    • a timeline for the project
    • preliminary diagrams or performance metrics as appropriate
  • Engineers SHOULD NOT start work on a DD until the PRD has been approved and merged.
  • Engineers SHOULD only do enough engineering work prior to the DD approval to allow them to write a good DD.
  • Once all required approvals have been received, the DD SHOULD be merged within 72 hours.

PRD Template

See prd.template.md for a template for PRDs.

DD Template

See dd.template.md for a template for DDs.