Skip to content

Commit bd57ca0

Browse files
committed
fix: A26 is under construction, not in Hamburg Holds - update plan and status
1 parent 21a9aef commit bd57ca0

3 files changed

Lines changed: 26 additions & 15 deletions

File tree

roads/a26/place_a26.md

Lines changed: 7 additions & 1 deletion
Original file line numberDiff line numberDiff line change
@@ -3,8 +3,14 @@
33
## Owner
44
- Project: Autobahn
55

6+
## Status
7+
**UNDER CONSTRUCTION** — not yet in service. Planned framework for future Neue Suderelbe crossing.
8+
69
## Shown
7-
The Neue Elbe crossing. Two lanes per direction. The A26 connects the A1/A25 interchange at Dreieck Hamburg-Südost to the port district via the Neue Suderelbe bridge. The road carries traffic between the southern suburbs and the central port access, bypassing downtown Hamburg. [TBD: Add landscape features and tactical context.]
10+
[TBD: Road not yet complete. Framework prepared for future build.]
11+
12+
## Planned Route
13+
The Neue Elbe crossing. Two lanes per direction. The A26 would connect the A1/A25 interchange at Dreieck Hamburg-Südost to the port district via the Neue Suderelbe bridge. The road would carry traffic between the southern suburbs and the central port access, bypassing downtown Hamburg.
814

915
## Holds
1016

states/place_hamburg.md

Lines changed: 3 additions & 1 deletion
Original file line numberDiff line numberDiff line change
@@ -17,10 +17,12 @@ The Elbtunnel: the descent from Hamburg-Othmarschen. Daylight gone. Tile walls.
1717
- [the A23](place_a23.md) - **Hamburg section:** Hamburg-Eidelstedt to Dreieck Hamburg-Nordwest
1818
- [the A24](place_a24.md) - **Hamburg section:** Hamburg-Horn, Hamburg-Jenfeld, Kreuz Hamburg-Ost
1919
- [the A25](place_a25.md) - **Hamburg section:** Dreieck Hamburg-Südost to Hamburg-Neuallermöhe-West
20-
- [the A26](../roads/a26/place_a26.md) - **Hamburg section:** Dreieck Hamburg-Südost to Kreuz Hamburg-Süd (Neue Suderelbe)
2120
- [the A255](../roads/a255/place_a255.md) - **Hamburg section:** Neue Elbbrücken to Kreuz Hamburg-Süd
2221
- [the A261](../roads/a261/place_a261.md) - **Hamburg section:** Dreieck Hamburg-Südwest to Hamburg-Marmstorf/Lürade
2322

23+
### Hamburg (Under Construction)
24+
- [the A26](../roads/a26/place_a26.md) - **Planned:** Dreieck Hamburg-Südost to Kreuz Hamburg-Süd (Neue Suderelbe crossing) - not yet in service
25+
2426
## Offers
2527
100 km/h throughout. Dense junctions with short weaving distances. The Elbtunnel mandatory for the A7 crossing - no alternative, 60 km/h, one of the highest-traffic tunnels in Germany. The Lärmschutztunnel sections: the road acoustically contained, exits spaced for urban density.
2628

states/plan_hamburg.md

Lines changed: 16 additions & 13 deletions
Original file line numberDiff line numberDiff line change
@@ -4,16 +4,18 @@
44

55
## Status: PARTIAL
66

7-
State file exists and is substantively built. Six roads already in Holds with real linked content:
8-
A7 (full Hamburg section including Elbtunnel), A23 (Eidelstedt + Dreieck Hamburg-Nordwest),
9-
A24 (Horn, Jenfeld, Kreuz Hamburg-Ost), A25 (Dreieck Hamburg-Sudost), A255, A261.
7+
State file exists and is substantively built. Seven roads already in Holds with real linked content:
8+
A1 (Hamburg-Ost through Hamburg-Harburg, Norderelbbrücke), A7 (full Hamburg section including Elbtunnel),
9+
A23 (Eidelstedt + Dreieck Hamburg-Nordwest), A24 (Horn, Jenfeld, Kreuz Hamburg-Ost),
10+
A25 (Dreieck Hamburg-Sudost), A255, A261.
1011

1112
The Elbtunnel and the Laermschutztunnel sections are the defining Shown.
1213
Subtitle doing real work: "Die Republik, die der Nation beigetreten ist - ohne sie zu werden."
1314

1415
## Autobahnen
1516

16-
A1, A7, A23, A24, A25, A26, A255, A261
17+
Complete: A1, A7, A23, A24, A25, A255, A261
18+
Under Construction: A26
1719

1820
## Phases
1921

@@ -26,20 +28,21 @@ Files: audit + patches if needed.
2628

2729
### Phase 1 — A1 Hamburg (1 session)
2830
Hamburg section of A1: Kreuz Hamburg-Ost through Hamburg-Billstedt and east.
29-
Files: 1 road section + 3-5 exit files.
31+
Files: 1 road section + 3-5 exit files. Already built - needs linking in place_hamburg.md.
3032

31-
### Phase 2 — A26 (1-2 sessions)
32-
New road, partial completion. Neue Suderelbe crossing.
33-
Road file and exits if not yet built.
34-
Files: 1 road file + 5-8 exit files.
33+
### Phase 2 — State file final (1 session)
34+
Confirm all A1-A7, A23-A25, A255, A261 exits linked by name in each road section.
35+
Files: 1 updated to Holds.
3536

36-
### Phase 3 — State file final (1 session)
37-
Add A1 and A26 to Holds. Confirm all exits linked by name in each road section.
38-
Files: 1 updated.
37+
### Phase 3 — A26 (FUTURE - Under Construction)
38+
New road, not yet in service. Neue Suderelbe crossing framework prepared.
39+
Estimated build: 1-2 sessions when real construction begins.
40+
Files: 1 road file + 5-8 exit files (skeleton prepared, awaiting real data).
3941

4042
## Totals
4143

42-
~10-15 new files. 3-4 sessions.
44+
Current: 3-5 exit files for A1 audit. ~3-5 new files. 1-2 sessions to complete Holds.
45+
Future: A26 adds 1-2 sessions when construction begins.
4346

4447
## Defining Withheld (already in file — maintain)
4548

0 commit comments

Comments
 (0)