Update spack-stack-dev from spack develop 2026/01/09 #1861
unit_tests.yaml
on: pull_request
shell
33s
rhel8-platform-python
23s
clingo-cffi
32s
windows
0s
package.py canonicalization
3m 37s
Matrix: macos
Matrix: ubuntu
Annotations
12 errors
|
rhel8-platform-python
Process completed with exit code 2.
|
|
clingo-cffi
Process completed with exit code 2.
|
|
ubuntu (ubuntu-latest, 3.14, false)
Process completed with exit code 2.
|
|
shell
Process completed with exit code 2.
|
|
ubuntu (3.7, ubuntu-22.04, false)
The strategy configuration was canceled because "ubuntu.ubuntu-latest_3_14_false" failed
|
|
ubuntu (3.7, ubuntu-22.04, false)
Process completed with exit code 2.
|
|
macos (macos-latest, 3.14)
Process completed with exit code 1.
|
|
macos (macos-15-intel, 3.14)
The strategy configuration was canceled because "macos.macos-latest_3_14" failed
|
|
macos (macos-15-intel, 3.14)
The operation was canceled.
|
|
package.py canonicalization
Canceling since a higher priority waiting request for unit_tests-refs/pull/574/merge-574 exists
|
|
package.py canonicalization
Process completed with exit code 1.
|
|
unit tests
Canceling since a higher priority waiting request for unit_tests-refs/pull/574/merge-574 exists
|