Snow input layout and label adjustments #5340
ci.yml
on: push
Matrix: build-mac
Matrix: build-ubuntu
Matrix: build-windows
Annotations
6 errors and 2 notices
|
build-mac (macos-14-large)
The operation was canceled.
|
|
build-mac (macos-14-large)
The job has exceeded the maximum execution time of 6h0m0s
|
|
build-mac (macos-latest)
The operation was canceled.
|
|
build-mac (macos-latest)
The job has exceeded the maximum execution time of 6h0m0s
|
|
build-ubuntu (3.10)
The operation was canceled.
|
|
build-ubuntu (3.10)
The job has exceeded the maximum execution time of 6h0m0s
|
|
build-mac (macos-latest)
The macos-latest label will migrate to macOS 15 beginning August 4, 2025. For more information see https://github.com/actions/runner-images/issues/12520
|
|
build-mac (macos-latest)
The macos-latest label will migrate to macOS 15 beginning August 4, 2025. For more information see https://github.com/actions/runner-images/issues/12520
|