Skip to content

Merge pull request #62 from SheffieldSolar/60_fix_broken_README_links #119

Merge pull request #62 from SheffieldSolar/60_fix_broken_README_links

Merge pull request #62 from SheffieldSolar/60_fix_broken_README_links #119

Triggered via push November 3, 2025 12:51
Status Failure
Total duration 39s
Artifacts

python-app.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (3.10)
Process completed with exit code 1.
build (3.11)
The strategy configuration was canceled because "build._3_10" failed
build (3.11)
The operation was canceled.
build (3.12)
The strategy configuration was canceled because "build._3_10" failed
build (3.12)
The operation was canceled.