Skip to content

Snooze #69

Description

@Fonzi03

Checklist

  • I have filled out the template to the best of my ability.
  • This only contains 1 feature request (if you have multiple feature requests, open one feature request for each feature request).
  • This issue is not a duplicate feature request of previous feature requests.
  • I have read the "Important Note" section of the readme and this feature request fits the scope of the integration.

Is your feature request related to a problem? Please describe.

No, its an enhancement request

Describe the solution you'd like

A snooze button would be helpful instead of only complete. For tasks which have an annual check but not always replaced for instance it would be nice to be able to snooze them so they don't get marked as completed from a historical view when they were just inspected.

If snooze is selected, and interval time selection should be presented with an option to automatically skip to/choose the next scheduled interval.

Describe alternatives you've considered

Creating two tasks, one inspection and one replacement but then the replacement item would show past due and wouldnt be as clean

Additional context

The first item I am working on is boiler maintenance: oil tank filter, pump screen, nozzle, electrode, heat exchange cleaning.

pump screen, and electrode for instance would be inspected with the annual maintenance of the tank filter, nozzle and heat exchange cleaning but not necessarily replaced.

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions