The release process

Releasing one DuckDB line, as a finite state machine: clusters, states, gates, multi-line coordination, and rollback. It operates on the branch model of branches/model/ and must leave every series invariant standing (branches/invariants/). The reverse-dependency runs are testing/revdep/'s, the version counters versioning/'s, and CRAN submission cran/'s.

Three placeholders run through this page, and nothing else stands in for a name. <S> is the series — one upstream line of duckdb/duckdb, and the refs that carry it. N is its major.minor token, which is what a flavor suffix is built from (branches/flavors/). X.Y.Z is the version being released.

Four refs matter here:

  • the release branchmain for the current line, <S> for a legacy one, in duckdb/duckdb-r. It sits at the last release and is what CRAN and r-universe publish.
  • <S>-lts — the release branch plus the flavor rename, where an LTS line has one.
  • <S>-dev — what CI judges commit by commit, and what the .dev flavor is built from.
  • <S>-green — the trusted frontier (branches/model/).

Green moves itself: the series loop fast-forwards it over commits with recorded successful runs, so promoting a release point is not a step anyone performs.

At any moment a series is in exactly one of four clusters. The clusters — not the individual states — are the unit of coordination when several series release together (see Multi-line coordination).

Clusters

Cluster States Driver Mutates main glue? Vendored commits → mainline? Loops?
TRACK 0 the series loop no — forward-ports pass through no
STABILIZE 0.1–0.5 calendar / human (T−14 → tag) yes (fold-back fixes are born here) no revdep ⇄ fold-back
CUT 1–5 upstream tag, then mechanical no yes — the only cluster that does red ⇄ fix-in-commit
RESET 6 script no no

The single most important property of the whole design is the pair of middle columns: vendored commits enter the mainline in exactly one cluster (CUT), and main's glue changes only in TRACK and STABILIZE. The two never overlap, which is what keeps main CRAN-releasable at all times.

State diagram

stateDiagram-v2
    [*] --> TRACK

    state TRACK {
        Tracking : 0 TRACKING — vendor + forward-port, all green
    }

    state STABILIZE {
        Pinned : 0.1 CANDIDATE PINNED
        Revdep1 : 0.2 REVDEP-1
        FoldBack : 0.3 FOLD-BACK (fix on main, forward-port)
        Revdep2 : 0.4 REVDEP-2 (go / no-go)
        Freeze : 0.5 GLUE FREEZE (barrier)
        Pinned --> Revdep1
        Revdep1 --> FoldBack
        FoldBack --> Revdep2
        Revdep2 --> FoldBack : regressions
        Revdep2 --> Freeze : go
        Freeze --> Freeze : late glue re-arms
    }

    state CUT {
        Vendored : 1 VENDORED
        Review : 2 REVIEW
        Promoted : 3 PROVEN (green covers the tag)
        Merged : 4 MERGED (release branch bump, LTS rebase)
        Published : 5 PUBLISHED (tag, r-universe, CRAN)
        Vendored --> Vendored : red / fix-in-commit
        Vendored --> Review : green
        Review --> Vendored : drift
        Review --> Promoted : ok
        Promoted --> Merged
        Merged --> Published
    }

    state RESET {
        Rebaselined : 6 RE-BASELINED (legacy series only)
    }

    TRACK --> STABILIZE : T-14 open window
    STABILIZE --> CUT : upstream tag vX.Y.Z
    CUT --> RESET : published
    RESET --> TRACK
    note right of CUT : CRAN acceptance is an async tail (current line only)
Loading

States

State Enter when <S>-dev <S>-green release / -lts branch Gate to leave On failure
0 TRACKING RESET done grows: vendor + forward-port advances with CI frozen at X.Y.(Z-1) maintainer opens window (≈ T−14)
0.1 CANDIDATE PINNED window opens fixes only; pin likely release commit advances with CI frozen candidate green
0.2 REVDEP-1 candidate pinned revdep run triaged
0.3 FOLD-BACK findings exist fold-back forward-ports land advances with CI fixes born on main, then ported findings resolved/accepted loop to 0.4
0.4 REVDEP-2 ≈ T−7 go / no-go fail → 0.3
0.5 GLUE FREEZE go frozen (barrier; all lines aligned) catches up, then frozen frozen upstream tags vX.Y.Z late glue → re-arm 0.5
1 VENDORED tag lands on <S>-dev tagged vendor commit present advancing toward the tag frozen tagged commit green (each.yaml) red → fix in-commit, force-push <S>-dev
2 REVIEW green release branch ..tagged clean drift → fix on main, forward-port
3 PROVEN review ok has advanced over the tagged commit green covers the tag red → 1
4 MERGED proven frozen at tagged commit tagged content merged; fledge bump to X.Y.Z; -lts rebased release branch green version conflict (merge driver) / red CI
5 PUBLISHED merged tag vX.Y.Z pushed; r-universe builds; CRAN submitted (current line) tag pushed CRAN reject → new patch cycle
6 RE-BASELINED published legacy series only: recreated from the new release branch plus the flavor rename; a series-loop series carries straight on back to TRACK

The On failure column is the whole of rollback: there is no state this machine cannot be walked back out of, and no failure that discards a green commit.

TRACK — steady state

Nothing to do: this is the series loop running unattended (operations/vendoring/series-loop/), with each.yaml judging every new commit, and glue changes flowing in from main through the forward-port chain. The trusted frontier is "what would ship if we released now."

A maintainer leaves TRACK by opening the release window, about two weeks before the expected upstream release date, which enters STABILIZE.

STABILIZE — pre-release (≈ T−14 → tag)

The goal is to prove the release candidate against reverse dependencies before upstream cuts the tag, so that regressions can be folded back — into the glue, into patch/, or reported upstream — while there is still time. STABILIZE mutates only main (fold-back fixes) and <S>-dev (forward-ports plus ongoing vendoring); the release branches stay at the previous release, so the whole cluster is abortable with zero rollback.

Preflight

0.1 Pin the release candidate

Upstream commits land up to and including release day, so the release commit is a moving target. Ask upstream for the most likely release commit and pin it. From here, only fixes flow into the glue source of truth, not features. Re-pin as upstream advances; a re-pin forces a re-run of the reverse-dependency checks only if the delta touches anything risky — what ships must have been tested.

0.2 / 0.4 Reverse-dependency checks

Two runs against the pinned candidate: an early pass with time to act on what it finds, and a second at about T−7 that is the go/no-go gate. How they are run and where the results land is testing/revdep/'s.

0.3 Fold back

Every fold-back fix is born on main and forward-ported down the chain — never authored directly on a <S>-dev branch. C++ issues go into patch/ and are simultaneously sent upstream as a pull request, so the patch can eventually retire (operations/vendoring/pipeline/). Contact the maintainers of any broken reverse dependencies. Loop back to 0.4 until clean or explained.

0.5 Glue freeze (barrier)

Freeze glue across all releasing series and confirm git cherry main <S>-dev is empty for each — every releasing line now carries identical glue. A late glue change after this point is allowed but re-arms the freeze: land it on main, forward-port it to every releasing <S>-dev, re-run a targeted revdep, and only then proceed. The clock resets to 0.5; it is not a scramble.

CUT — release execution

Triggered by upstream tagging vX.Y.Z. This is the only cluster that moves vendored commits into the mainline, and it does so through reviewed, green, gated steps. You release the tagged commit, not the <S>-dev tip — upstream has usually moved on by now, and the post-tag commits stay queued for the next cycle.

1 VENDORED → 2 REVIEW → 3 PROMOTED

  1. The series loop produces the vendor: … (tag vX.Y.Z) … commit on <S>-dev; wait for each.yaml to show it green. If vendoring broke the build, fix it in the same commit and force-push <S>-dev.
  2. Review the pending window — the release branch against the tagged commit, which is what the ahead badge counts — and confirm it holds only the expected vendor commits and intended forward-ports, with no glue drift.
  3. Nothing to promote: the loop fast-forwards <S>-green over the tagged commit as soon as it is green. Confirm green covers it before going on.

4 MERGED — the release branch and the version bump

Bring the tagged <S>-dev content onto the release branch linearly, never as a merge commit — the active history stays merge-free so it stays bisectable. Fast-forward or rebase the tagged range onto the release branch, dropping the flavor rename commit. The DESCRIPTION version conflict is resolved automatically by the merge driver (versioning/); run scripts/setup-git.sh first if this is a fresh clone or CI runner. Because <S>-dev descends from its release point, the only rewriting is dropping that rename.

The package version is not derived from the git tag — set it explicitly so DESCRIPTION matches the upstream tag:

fledge::bump_version("X.Y.Z")

Then rebase the LTS branch, one rename commit on top of the release branch:

# in the <S>-lts worktree
git rebase origin/<S> && git push origin <S>-lts

Build the source tarball and take it through WinBuilder and the CRAN preflight before tagging (cran/).

5 PUBLISHED — tag and publish

Tag the release and push; r-universe rebuilds automatically:

git tag vX.Y.Z origin/<S>-lts   # or origin/<S> per series convention
git push origin vX.Y.Z

For the current line only, submit to CRAN (cran/). Acceptance is asynchronous and overlaps RESET and the next TRACK, so the tag and the r-universe publish do not wait for it; a rejection is fixed on the release branch and re-enters CUT as a follow-up patch.

RESET — re-baseline

A series running the loop needs no reset: <S>-dev and <S>-green carry straight on past the release point, and the series is back in TRACK the moment the release branch has moved.

A legacy series — one not yet reseeded into the loop — is rebuilt from the freshly released tip plus the flavor rename:

git checkout -b <S>-dev-base origin/<S>
scripts/flavor.sh <N>.dev        # the major.minor token, e.g. 1.4.dev
git push krlmlr <S>-dev-base --force-with-lease
git push krlmlr <S>-dev-base:<S>-dev --force-with-lease

Either way the glue source of truth (main) separately moves to its ongoing development version via fledge, and the vendor counter resumes from the new baseline (versioning/).

Multi-line coordination

When several series release together — a current line on CRAN plus an LTS line on r-universe — coordinate at the cluster level:

  • STABILIZE ends on a shared barrier. All releasing lines must reach 0.5 GLUE FREEZE together; this is the forward-port barrier that guarantees identical glue across lines, and it is the one hard synchronization point.
  • CUT runs per line, pipelined, CRAN line first. Submit the CRAN line early because its acceptance is asynchronous; the r-universe-only LTS line finishes alongside with no CRAN tail.
  • The preview line — the next major, tracking upstream main — lives in a long-running TRACK/STABILIZE: its STABILIZE is the upstream release-candidate window, and its CUT is the atomic fast-forward flip of main. The flip requires main to be an ancestor of main-dev, which is not maintained continuously — it is established once, just before the flip, by rewinding to the bifurcation and replaying. Same machine, different durations; the only other addition is that vendor-coupled glue may be born on its <S>-dev, the one documented exception to R-side work being born on main.

What each cluster must leave standing

Every cluster hands the series on with its invariants intact:

  • TRACK and STABILIZE keep the flavor names internally consistent, the history linear, the glue identical down the forward-port chain, and every <S>-dev commit green.
  • CUT is the controlled transition where the release branches advance to the tagged commit <S>-green has already proven; the version and flavor invariants must hold at the new release point.
  • RESET re-establishes a baseline that is the released tree plus the rename, and nothing else.