Skip to content

Latest commit

 

History

History
112 lines (79 loc) · 4.36 KB

File metadata and controls

112 lines (79 loc) · 4.36 KB

Project Status — Parsify

Living progress dashboard. Updated by /status-sync, /issue, and /phase-gate. This is a Tier 1 document — always read when starting a session.


Current Status

Active Phase: Baseline complete — ready for future work Overall Progress: 47/51 planned issues delivered (92%) + SC001 (dashboard) delivered Last Updated: 2026-06-17 Last Updated By: status-sync (legacy baseline reconciliation)

Reconciliation note (2026-06-17): Parsify was built as a legacy project before the Torvaldsen workflow was applied. All implementation work landed on development and was merged to main during this reconciliation. The original 6-phase plan (#2–#52) is now treated as the delivered baseline. The project is functionally done; remaining items are genuine future work, not in-progress.


Progress by Phase

Phase Name Total Done In Progress Blocked Available %
0 Codebase Cleanup 11 11 0 0 0 100%
1 FastAPI REST Wrapper 11 11 0 0 0 100%
2 Billing & Usage 8 8 0 0 0 100%
3 CI/CD + Database 9 9 0 0 0 100%
4 Docs + Landing Page 5 1 0 0 4 20%
5 SDK + Launch 7 7 0 0 0 100%
Total 51 47 0 0 4 92%

Plus SC001 (post-baseline scope addition): Clerk-authenticated developer dashboard (backend + React/TypeScript frontend) — delivered, no original issue.


Current Sprint

Next Available Issues (genuine future work)

Issue Title Type Area Notes
#42 Build landing page feat ui May be partially satisfied by the SC001 dashboard home.tsx/pricing.tsx — review and close if covered
#43 Documentation (docs/landing) docs docs Not built
#44 Documentation (docs/landing) docs docs Not built
#45 Documentation (docs/landing) docs docs Not built

Currently In Progress

None.

Blocked Issues

None.


Recent Activity

Date Agent Action Issue Details
2026-06-17 Claude Opus 4.8 Status sync Reconciled legacy baseline; merged developmentmain, closed 47 delivered issues, recorded SC001
2026-06-17 Claude Opus 4.8 Commit SC001 Committed Clerk dashboard auth + React frontend + tests + git hygiene
2026-03-22 Claude Opus 4.6 Decompose Created 51 issues across 6 phases, locked scope
2026-03-22 Claude Opus 4.6 Brainstorm Generated product foundation (9 documents)
2026-03-22 Claude Opus 4.6 Bootstrap Installed Torvaldsen workflow

Blockers & Risks

Active Blockers

No active blockers.

Upcoming Risks

# Risk Phase Mitigation Status
R1 crawl4ai breaking changes maint Pin version, integration tests Monitoring
R2 OpenAI API cost spikes maint Usage limits, cost tracking Monitoring
R4 Baseline quality debt maint Resolved 2026-06-17: ruff clean, mypy clean (api+src), 570 tests pass ✅ Closed
R5 Clerk auth (SC001) diverges from ADR-004 maint Resolved 2026-06-17: documented in ADR-008 (dual-auth model) ✅ Closed
R6 Security debt in dashboard auth path maint Resolved 2026-06-17: JWT issuer/azp/RS256 hardened, squat-proof + race-safe, 15 tests ✅ Closed

Scope Health

Scope Manifest Status: LOCKED (2026-03-22), 1 scope change recorded Total Features: 6 (F000–F005) + SC001 Features Complete: 6 baseline features delivered Scope Changes: 1 (SC001 — developer dashboard, recorded post-hoc)


Quality Metrics

Metric Current (2026-06-17) Target
pytest 570 passed, 3 skipped, 0 errors 0 errors
ruff All checks passed 0
mypy (api/) Clean (36 files) 0
mypy (src/) Clean (19 files, gradual config) 0

Production-hardening pass (2026-06-17) closed R4/R5/R6: security-hardened the dashboard auth path, brought the test suite from 307→570 passing (fixing a real shared-registry concurrency bug and several cleaning-engine bugs), and made lint + types clean. Tooling config (ruff/mypy/pytest) added to pyproject.