Skip to content

feat: emit per-request rate-limit limits into dynamic metadata #6014

feat: emit per-request rate-limit limits into dynamic metadata

feat: emit per-request rate-limit limits into dynamic metadata #6014

Triggered via pull request June 18, 2026 14:36
Status Cancelled
Total duration 14m 48s
Artifacts

build_and_test.yaml

on: pull_request
changes
6s
changes
Matrix: Controller Test
Matrix: CRD CEL Validation Test
Matrix: test_data_plane
Matrix: test_data_plane_mcp
Matrix: test_e2e
Matrix: test_e2e_upgrade
Matrix: Unit Test
E2E Test for Inference Extensions
8m 6s
E2E Test for Inference Extensions
E2E Test for aigw CLI
6m 51s
E2E Test for aigw CLI
E2E Test for Namespaced Controller
7m 35s
E2E Test for Namespaced Controller
ci-required
4s
ci-required
Matrix: Push Docker Images / docker_builds
Waiting for pending jobs
Push Helm chart
Push Helm chart
Fit to window
Zoom out
Zoom in

Annotations

14 errors
E2E Test (Envoy Gateway latest)
Canceling since a higher priority waiting request for refs/pull/2244/merge-Build and Test-kanurag94-pull_request exists
E2E Test (Envoy Gateway latest)
The operation was canceled.
E2E Test (Envoy Gateway v1.8.1)
Canceling since a higher priority waiting request for refs/pull/2244/merge-Build and Test-kanurag94-pull_request exists
E2E Test (Envoy Gateway v1.8.1)
The operation was canceled.
E2E Test for Upgrades (k8s v1.33.4)
Canceling since a higher priority waiting request for refs/pull/2244/merge-Build and Test-kanurag94-pull_request exists
E2E Test for Upgrades (k8s v1.33.4)
The operation was canceled.
E2E Test for Upgrades (k8s v1.35.0)
Canceling since a higher priority waiting request for refs/pull/2244/merge-Build and Test-kanurag94-pull_request exists
E2E Test for Upgrades (k8s v1.35.0)
The operation was canceled.
E2E Test for Upgrades (k8s v1.32.8)
Canceling since a higher priority waiting request for refs/pull/2244/merge-Build and Test-kanurag94-pull_request exists
E2E Test for Upgrades (k8s v1.32.8)
The operation was canceled.
E2E Test for Upgrades (k8s v1.34.3)
Canceling since a higher priority waiting request for refs/pull/2244/merge-Build and Test-kanurag94-pull_request exists
E2E Test for Upgrades (k8s v1.34.3)
The operation was canceled.
ci-required
Process completed with exit code 1.
Build and Test
Canceling since a higher priority waiting request for refs/pull/2244/merge-Build and Test-kanurag94-pull_request exists