Skip to content

SAK v7 audit-remediation umbrella — intent-eval-lab (specs + governance + dashboard) #80

Description

@jeremylongshore

Context

Plan 031 v7 (SAK audit-closure amendment) closes the 12 P0 cluster surfaced by the 2026-05-28 incremental Plan Audit. This issue is the umbrella tracker for SAK remediation work landing in intent-eval-lab (governance, dashboard, doc-singularity, specs).

Plan + audit refs

  • Plan amendment: 000-docs/033-PP-PLAN-skill-refiner-sak-amendment-v7-2026-05-28.md
  • v6 introduction: 000-docs/031-PP-PLAN-skill-refiner-sak-amendment-v6-2026-05-28.md
  • Charter draft: 000-docs/032-AT-DECR-isedc-class-1-charter-spec-authority-kernel-draft-2026-05-28.md
  • Audit synthesis: 000-docs/audit/2026-05-28-sak-incremental-audit/synthesis.md
  • STATUS: NEEDS-AMENDMENT → v7 deltas land → re-audit gating per § 14.30

Beads under this umbrella (6 total)

Schemas-as-policy eval (C2 supplement) — 1 P0:

  • bd_000-projects-hi7e — Schema-policy eval: does kernel $defs.isMarketplace match curated corpus?

Governance + cadence + doc sprawl (C4+C5) — 4 P1:

  • bd_000-projects-kp30 — Governance owners doc: 7-seat decision-authority taxonomy (§ 14.12)
  • bd_000-projects-39qj — 90-day CI gate re-eval cadence (§ 14.13.3)
  • bd_000-projects-kj6p — SAK-DASHBOARD.md machine-rendered (§ 14.13.1)
  • bd_000-projects-ho6o — SAK-INDEX.md ≤ 2 pages canonical entry (§ 14.28.1)

v6 SAK charter (deferred until v7 RATIFIED-WITH-DELTAS):

  • bd_000-projects-8vq0 — ISEDC Class-1 charter convening

Gating

All beads gated on plan 031 v7 re-audit returning 0 new P0 → STATUS = RATIFIED-WITH-DELTAS → ISEDC Class-1 charter convenes → SAK Phase 1 ships.

— Jeremy Longshore
intentsolutions.io

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions