build(deps-dev): bump vite from 6.1.1 to 6.1.5 #9
verify.yml
on: pull_request
Matrix: verify-pr
Report PR verification status
2s
Annotations
12 errors
|
verify-pr (22.x, use-long-press)
Process completed with exit code 1.
|
|
verify-pr (20.x, react-interval-hook)
The operation was canceled.
|
|
verify-pr (20.x, react-interval-hook)
The strategy configuration was canceled because "verify-pr._22_x_use-long-press" failed
|
|
verify-pr (22.x, react-interval-hook)
The operation was canceled.
|
|
verify-pr (22.x, react-interval-hook)
The strategy configuration was canceled because "verify-pr._22_x_use-long-press" failed
|
|
verify-pr (20.x, use-long-press)
The operation was canceled.
|
|
verify-pr (20.x, use-long-press)
The strategy configuration was canceled because "verify-pr._22_x_use-long-press" failed
|
|
verify-pr (22.x, use-double-tap)
The operation was canceled.
|
|
verify-pr (22.x, use-double-tap)
The strategy configuration was canceled because "verify-pr._22_x_use-long-press" failed
|
|
verify-pr (20.x, use-double-tap)
The operation was canceled.
|
|
verify-pr (20.x, use-double-tap)
The strategy configuration was canceled because "verify-pr._22_x_use-long-press" failed
|
|
Report PR verification status
Process completed with exit code 1.
|