fix(agile-lifecycle): address Gemini PR #59 review comments
- plugin.json: fix gates count from '10 gates, 13 skills' to '6 formal gates (A-F), 9 skills' - agile-gate-review.md: fix gate table to canonical A-F (Portfolio Entry → Governance Review) - gate-reviewer.md: fix gate refs (A-J → A-F), schema ref (gate-io-matrix → evidence-index), sign-off table - feasibility-screening.md: fix template refs (early-feasibility-note → feasibility-note, initial-risk-note → risk-register-init, ai-data-feasibility-note removed) - problem-validation.md: fix template path prefix (phase-3/ → phase-1/ for phase-1 agent) - sprint-design.md: fix template refs (phase-4/iteration-plan → phase-3/sprint-backlog, phase-4/iteration-goal and committed-work-set removed, transversal/dod → phase-3/dod-checklist), remove non-existent schemas (product-backlog, acceptance-criteria) Generated by Nuno Salvação Co-Authored-By: Nexo <nexo.modeling@gmail.com>
1 parent 416c60b commit 6bd87f2

6 files changed

Lines changed: 36 additions & 44 deletions

File tree

plugins/agile-lifecycle/.claude-plugin/plugin.json

Lines changed: 1 addition & 1 deletion
Original file line numberDiff line numberDiff line change
@@ -1,7 +1,7 @@
11
{
22
"name": "agile-lifecycle",
33
"version": "0.1.0",
4-
"description": "Hybrid gated-iterative lifecycle framework for AI/ML products — 7 phases, 10 gates, 31 agents, 13 skills, and full artefact management. Enterprise agile with governance overlay.",
4+
"description": "Hybrid gated-iterative lifecycle framework for AI/ML products — 7 phases, 6 formal gates (A–F), 31 agents, 9 skills, and full artefact management. Enterprise agile with governance overlay.",
55
"author": {
66
"name": "Nuno Salvacao",
77
"email": "nuno.salvacao@gmail.com",

plugins/agile-lifecycle/agents/phase-1/feasibility-screening.md

Lines changed: 5 additions & 7 deletions
Original file line numberDiff line numberDiff line change
@@ -31,11 +31,11 @@ The key deliverable is the Feasibility Note: a concise document that covers data
3131

3232
5. **Regulatory and ethical screening**: Identify: (a) applicable regulations (GDPR, AI Act, sector-specific regulations), (b) data privacy requirements, (c) AI ethics considerations (bias risk, transparency requirements, explainability needs), (d) any regulatory approvals needed. Flag high-risk areas for deeper assessment in Phase 3.
3333

34-
6. **Initial risk assessment**: Using `templates/phase-1/initial-risk-note.md.template`, identify the top 5-7 risks across all feasibility dimensions. Rate each as low/medium/high/critical probability and impact. For each HIGH/CRITICAL risk, document the initial mitigation approach.
34+
6. **Initial risk assessment**: Using `templates/phase-1/risk-register-init.md.template`, identify the top 5-7 risks across all feasibility dimensions. Rate each as low/medium/high/critical probability and impact. For each HIGH/CRITICAL risk, document the initial mitigation approach.
3535

3636
7. **Go/no-go recommendation**: Based on the above assessment, produce a clear recommendation: GO (proceed to problem validation), CONDITIONAL GO (proceed with named conditions), or NO GO (pivot or terminate). Document the rationale for the recommendation with reference to specific findings.
3737

38-
8. **Generate Feasibility Note**: Fill `templates/phase-1/early-feasibility-note.md.template` and `templates/phase-1/ai-data-feasibility-note.md.template` with all assessment findings and the go/no-go recommendation.
38+
8. **Generate Feasibility Note**: Fill `templates/phase-1/feasibility-note.md.template` with all assessment findings — covering technical, commercial, data, and regulatory dimensions — and the go/no-go recommendation.
3939

4040
## Expected Outputs
4141

@@ -46,9 +46,8 @@ The key deliverable is the Feasibility Note: a concise document that covers data
4646

4747
## Templates Available
4848

49-
- `templates/phase-1/early-feasibility-note.md.template` — main feasibility note
50-
- `templates/phase-1/ai-data-feasibility-note.md.template` — AI/data feasibility
51-
- `templates/phase-1/initial-risk-note.md.template` — initial risk documentation
49+
- `templates/phase-1/feasibility-note.md.template` — comprehensive feasibility note (technical, commercial, data, regulatory)
50+
- `templates/phase-1/risk-register-init.md.template` — initial risk register documentation
5251

5352
## Schemas
5453

@@ -74,8 +73,7 @@ Technical Lead or Solution Architect — accountable for technical and data feas
7473
This agent MUST read before producing any output:
7574
- `docs/phase-essentials/phase-1.md` — 1-pager: what to do, who, evidence required (START HERE)
7675
- `references/lifecycle-overview.md` — Phase 1 context and Gate A requirements
77-
- `templates/phase-1/early-feasibility-note.md.template` — fill ALL mandatory fields
78-
- `templates/phase-1/ai-data-feasibility-note.md.template` — fill ALL mandatory fields
76+
- `templates/phase-1/feasibility-note.md.template` — fill ALL mandatory fields
7977

8078
See also (consult as needed):
8179
- `references/gate-criteria-reference.md` — Gate A evidence requirements for Feasibility Note

plugins/agile-lifecycle/agents/phase-1/problem-validation.md

Lines changed: 7 additions & 7 deletions
Original file line numberDiff line numberDiff line change
@@ -25,17 +25,17 @@ This subfase uses qualitative and quantitative research methods appropriate to t
2525

2626
2. **User research execution**: Conduct research using the planned method. For interviews: use a semi-structured guide focused on current state pain, workarounds, and impact. Capture verbatim quotes as evidence. For data analysis: extract relevant metrics (error rates, processing times, failure rates) that quantify the problem.
2727

28-
3. **Pain point mapping**: Using `templates/phase-3/pain-point-map.md.template` (reused here for Phase 1 validation), systematically map pain points identified in research. For each pain point: who experiences it, how often, what is the impact, and what workaround is used currently. Rate severity (low/medium/high/critical).
28+
3. **Pain point mapping**: Using `templates/phase-1/pain-point-map.md.template` (reused here for Phase 1 validation), systematically map pain points identified in research. For each pain point: who experiences it, how often, what is the impact, and what workaround is used currently. Rate severity (low/medium/high/critical).
2929

30-
4. **User journey mapping**: If relevant, document the current-state user journey to identify where pain points occur in context. This reveals the full experience, not just the reported problem. Use `templates/phase-3/user-journey-map.md.template`.
30+
4. **User journey mapping**: If relevant, document the current-state user journey to identify where pain points occur in context. This reveals the full experience, not just the reported problem. Use `templates/phase-1/user-journey-map.md.template`.
3131

3232
5. **Market context analysis**: Research existing solutions (products, tools, processes) that address the same problem. Assess why they are insufficient or unavailable to the target user. This validates that the problem is unsolved in the current landscape.
3333

3434
6. **Evidence synthesis**: Compile all research findings into a coherent evidence package. The evidence must support specific, falsifiable claims about the problem. Avoid cherry-picking — acknowledge any contradictory findings and explain the interpretation.
3535

3636
7. **Problem statement validation**: Update the problem statement from subfase 1.1 with validated, evidence-backed language. If the research reveals the problem is different from originally hypothesized, revise the problem statement accordingly. If the problem is not validated, escalate to the Product Manager for a pivot or stop decision.
3737

38-
8. **Discovery findings document**: Fill `templates/phase-3/discovery-findings.md.template` with research methodology, key findings, evidence summary, pain-point severity map, and the validated problem statement. This is the primary artefact for this subfase.
38+
8. **Discovery findings document**: Fill `templates/phase-1/discovery-findings.md.template` with research methodology, key findings, evidence summary, pain-point severity map, and the validated problem statement. This is the primary artefact for this subfase.
3939

4040
## Expected Outputs
4141

@@ -46,9 +46,9 @@ This subfase uses qualitative and quantitative research methods appropriate to t
4646

4747
## Templates Available
4848

49-
- `templates/phase-3/discovery-findings.md.template` — primary research findings artefact
50-
- `templates/phase-3/pain-point-map.md.template` — pain point mapping
51-
- `templates/phase-3/user-journey-map.md.template` — user journey analysis
49+
- `templates/phase-1/discovery-findings.md.template` — primary research findings artefact
50+
- `templates/phase-1/pain-point-map.md.template` — pain point mapping
51+
- `templates/phase-1/user-journey-map.md.template` — user journey analysis
5252

5353
## Schemas
5454

@@ -74,7 +74,7 @@ Product Manager — accountable for research design quality and the decision to
7474
This agent MUST read before producing any output:
7575
- `docs/phase-essentials/phase-1.md` — 1-pager: what to do, who, evidence required (START HERE)
7676
- `references/lifecycle-overview.md` — Phase 1 context and validation approach
77-
- `templates/phase-3/discovery-findings.md.template` — fill ALL mandatory fields
77+
- `templates/phase-1/discovery-findings.md.template` — fill ALL mandatory fields
7878

7979
See also (consult as needed):
8080
- `references/gate-criteria-reference.md` — Gate A evidence requirements

plugins/agile-lifecycle/agents/phase-3/sprint-design.md

Lines changed: 7 additions & 11 deletions
Original file line numberDiff line numberDiff line change
@@ -34,28 +34,24 @@ Sprint design bridges the strategic iteration plan from Phase 2 with the daily e
3434

3535
6. **Dependency identification**: For each sprint item, identify: (a) internal dependencies between items, (b) external dependencies on other teams or systems. Create dependency log entries for external dependencies via risk-assumption-tracker. Flag any dependencies that are not yet resolved.
3636

37-
7. **Definition of Done confirmation**: Confirm the Definition of Done for this sprint — what quality criteria must ALL sprint items meet to be considered done? For AI/ML items, confirm model evaluation criteria are included. Document DoD using `templates/transversal/definition-of-done-by-phase.md.template`.
37+
7. **Definition of Done confirmation**: Confirm the Definition of Done for this sprint — what quality criteria must ALL sprint items meet to be considered done? For AI/ML items, confirm model evaluation criteria are included. Document DoD using `templates/phase-3/dod-checklist.md.template`.
3838

39-
8. **Sprint plan document**: Generate the Sprint Plan using `templates/phase-4/iteration-plan.md.template` with: sprint goal, committed backlog items, task breakdown, team capacity, dependency map, and DoD. This is the primary Sprint Backlog artefact.
39+
8. **Sprint plan document**: Generate the Sprint Plan using `templates/phase-3/sprint-backlog.md.template` with: sprint goal, committed backlog items, task breakdown, team capacity, dependency map, and DoD. This is the primary Sprint Backlog artefact.
4040

4141
## Expected Outputs
4242

43-
- `iteration-plan.md` — Sprint Plan with goal, committed backlog, task breakdown, and capacity
43+
- `sprint-backlog.md` — Sprint Plan with goal, committed backlog, task breakdown, and capacity
4444
- Sprint Backlog committed and visible to the team
4545
- Dependency log entries for external dependencies
4646
- Definition of Done for this sprint documented
4747

4848
## Templates Available
4949

50-
- `templates/phase-4/iteration-plan.md.template` — sprint plan document
51-
- `templates/phase-4/iteration-goal.md.template` — sprint goal definition
52-
- `templates/phase-4/committed-work-set.md.template` — committed backlog
53-
- `templates/transversal/definition-of-done-by-phase.md.template` — DoD definition
50+
- `templates/phase-3/sprint-backlog.md.template` — sprint plan document with committed backlog
51+
- `templates/phase-3/dod-checklist.md.template` — Definition of Done checklist
5452

5553
## Schemas
5654

57-
- `schemas/product-backlog.schema.json` — validates backlog item structure
58-
- `schemas/acceptance-criteria.schema.json` — validates acceptance criteria format
5955
- `schemas/dependency-log.schema.json` — validates dependency entries
6056

6157
## Responsibility Handover
@@ -77,7 +73,7 @@ Delivery Lead or Scrum Master — accountable for facilitating the sprint planni
7773
This agent MUST read before producing any output:
7874
- `docs/phase-essentials/phase-3.md` — 1-pager: what to do, who, evidence required (START HERE)
7975
- `references/lifecycle-overview.md` — Phase 3 sprint design approach
80-
- `templates/phase-4/iteration-plan.md.template` — fill ALL mandatory fields
76+
- `templates/phase-3/sprint-backlog.md.template` — fill ALL mandatory fields
8177

8278
See also (consult as needed):
8379
- `references/gate-criteria-reference.md` — Gate C (Backlog Readiness) requirements
@@ -118,7 +114,7 @@ See also (consult as needed):
118114

119115
### Evidence Required
120116

121-
- `iteration-plan.md` with sprint goal, committed backlog, task breakdown, and capacity
117+
- `sprint-backlog.md` with sprint goal, committed backlog, task breakdown, and capacity
122118
- Sprint Backlog in the team's backlog management tool (reference from plan)
123119
- Definition of Done confirmed for this sprint
124120

plugins/agile-lifecycle/agents/transversal/gate-reviewer.md

Lines changed: 6 additions & 6 deletions
Original file line numberDiff line numberDiff line change
@@ -7,11 +7,11 @@ color: green
77

88
## Context
99

10-
The gate-reviewer executes formal gate reviews (Gates A through J) and informal reviews (Backlog Readiness Review C, Retrospective Review H, KPI Review I) across the agile-lifecycle framework. Gates are critical governance checkpoints that control progression between phases and iterations.
10+
The gate-reviewer executes formal gate reviews across the 6 governance gates (A–F) of the agile-lifecycle framework. Gates are critical governance checkpoints that control progression between phases.
1111

1212
This agent uses rigorous evidence-based assessment to determine pass/fail/conditional-pass/waiver status for each gate. It reads gate criteria from `references/gate-criteria-reference.md`, verifies that all required artefacts exist and meet quality thresholds, and produces a formal gate-review-report.
1313

14-
Gates map to phases as follows: Gate A (Phase 1→2), Gate B (Phase 2→3), Gate C (Backlog Readiness), Gate D (Iteration→Validate), Gate E (Phase 5→6), Gate F (Post-hypercare), Gate G (Phase 6→7 if applicable), Gates H/I (periodic reviews), Gate J (Retirement).
14+
Gates map to phases as follows: Gate A (Phase 1→2, Portfolio Entry), Gate B (Phase 2→3, Inception Closure), Gate C (Phase 3→4, Backlog Readiness), Gate D (Phase 4→5, Release Authorization), Gate E (Phase 5→6, Operations Handover), Gate F (periodic in Phase 6, Governance Review).
1515

1616
## Workstreams
1717

@@ -43,7 +43,7 @@ Gates map to phases as follows: Gate A (Phase 1→2), Gate B (Phase 2→3), Gate
4343
## Expected Outputs
4444

4545
- `gate-review-report.md` (from `templates/transversal/gate-review-report.md.template`) — formal assessment with outcome
46-
- Updated `schemas/gate-io-matrix.schema.json` entry for this gate review
46+
- Updated `schemas/evidence-index.schema.json` entry for this gate review
4747
- Waiver entries (if applicable) using `templates/transversal/waiver-entry.md.template`
4848
- Updated `lifecycle-state.json` reflecting gate outcome
4949
- Clear remediation plan if gate fails or is conditional
@@ -57,7 +57,7 @@ Gates map to phases as follows: Gate A (Phase 1→2), Gate B (Phase 2→3), Gate
5757
## Schemas
5858

5959
- `schemas/gate-review.schema.json` — validates gate review report structure
60-
- `schemas/gate-io-matrix.schema.json` — validates gate I/O completeness
60+
- `schemas/evidence-index.schema.json` — validates evidence entries for gate I/O completeness
6161
- `schemas/waiver-log.schema.json` — validates waiver entries
6262

6363
## Responsibility Handover
@@ -88,7 +88,7 @@ See also (consult as needed):
8888

8989
### Mandatory Phase Questions
9090

91-
1. Which specific gate (A-J) is being reviewed, and what is the current lifecycle state?
91+
1. Which specific gate (A–F) is being reviewed, and what is the current lifecycle state?
9292
2. Are all required artefacts present and at the required quality threshold (exists/reviewed/approved)?
9393
3. Are there any unmitigated risks rated HIGH or CRITICAL that would block gate passage?
9494
4. Has the appropriate sign-off authority been identified and engaged?
@@ -129,7 +129,7 @@ See also (consult as needed):
129129

130130
### Sign-off Authority
131131

132-
Gate A: Product Manager + Sponsor. Gate B: Product Manager + Delivery Lead. Gates C/H/I: Product Manager (informal). Gate D: Product Manager + QA Lead (+ Security if LLM). Gate E: Product Manager + Sponsor + Operations Lead. Gate F: Operations Lead + Product Manager. Gate J: Sponsor + Product Manager. Mechanism: formal written approval on gate-review-report.
132+
Gate A: Product Manager + Sponsor. Gate B: Product Manager + Delivery Lead. Gate C: Product Manager (informal — backlog readiness). Gate D: Product Manager + QA Lead (+ Security if LLM). Gate E: Product Manager + Sponsor + Operations Lead. Gate F: Operations Lead + Product Manager. Mechanism: formal written approval on gate-review-report.
133133

134134
## How to Use
135135

plugins/agile-lifecycle/commands/agile-gate-review.md

Lines changed: 10 additions & 12 deletions
Original file line numberDiff line numberDiff line change
@@ -25,18 +25,16 @@ Gates are the governance checkpoints in the hybrid gated-iterative framework. Ea
2525

2626
## Gates Reference
2727

28-
| Gate | Timing | Purpose |
29-
|------|--------|---------|
30-
| A | End of Phase 1 | Opportunity validated, investment decision |
31-
| B | End of Phase 2 | Inception complete, delivery approved |
32-
| C | End of Phase 3 | Backlog readiness, discovery closure |
33-
| D | Mid Phase 4 | AI readiness, delivery health check |
34-
| E | End of Phase 4 iteration | Iteration review |
35-
| F | End of Phase 4 | Delivery complete, release candidate ready |
36-
| G | End of Phase 5 | Release approved, transition complete |
37-
| H | Mid Phase 6 | Operational health review |
38-
| I | End of Phase 6 | Improvement cycle review |
39-
| J | Phase 7 | Retirement decision approval |
28+
| Gate | Name | Timing | Purpose |
29+
|------|------|--------|---------|
30+
| A | Portfolio Entry | End of Phase 1 | Opportunity validated — fund and pursue? |
31+
| B | Inception Closure | End of Phase 2 | Architecture and plan approved — ready to build? |
32+
| C | Backlog Readiness | End of Phase 3 | Backlog ready, DoD agreed — ready to deliver? |
33+
| D | Release Authorization | End of Phase 4 | Build complete and quality confirmed — safe to release? |
34+
| E | Operations Handover | End of Phase 5 | Product stable in production — handover to ops? |
35+
| F | Governance Review | Periodic in Phase 6 | Continue, pivot, or retire? |
36+
37+
Authoritative criteria for each gate: `references/gate-criteria-reference.md`.
4038

4139
## What It Does
4240