[Athena] Fix accuracy CI: disable cancel-in-progress #936
ci.yml
on: push
Build
14s
Lint
59s
Unit Tests
20m 15s
Acceptance Tests
5m 14s
Annotations
7 errors and 4 warnings
|
Lint
Process completed with exit code 1.
|
|
Lint:
timing/pipeline/stages.go#L31
File is not properly formatted (gofmt)
|
|
Lint:
scripts/decoder_validation/main.go#L73
File is not properly formatted (gofmt)
|
|
Lint:
scripts/accuracy_validation.go#L216
File is not properly formatted (gofmt)
|
|
Acceptance Tests
Process completed with exit code 1.
|
|
Unit Tests
The job has exceeded the maximum execution time of 20m0s
|
|
Unit Tests
The operation was canceled.
|
|
Build
The process '/usr/bin/git' failed with exit code 128
|
|
Lint
The process '/usr/bin/git' failed with exit code 128
|
|
Acceptance Tests
The process '/usr/bin/git' failed with exit code 128
|
|
Unit Tests
The process '/usr/bin/git' failed with exit code 128
|