Update sbt-scoverage to 2.4.4 #501
Annotations
6 errors
|
build (2.13.15)
Process completed with exit code 1.
|
|
build (2.12.20)
The strategy configuration was canceled because "build._2_13_15" failed
|
|
build (2.12.20)
The operation was canceled.
|
|
build (3.3.7)
The strategy configuration was canceled because "build._2_13_15" failed
|
|
build (3.3.7)
The operation was canceled.
|
|
Final Results
Process completed with exit code 1.
|