Skip to content

Commit 0a957a1

Browse files
author
intern_nemotron_worker_4
committed
task321 closeout merge runbook
1 parent 292c5bf commit 0a957a1

5 files changed

Lines changed: 273 additions & 4 deletions

File tree

Lines changed: 4 additions & 4 deletions
Original file line numberDiff line numberDiff line change
@@ -1,14 +1,14 @@
11
# intern_nemotron_worker_4 - status
22

3-
<!-- METADATA:STATUS=ReadyForPR,TASK=task313_qwen_all_sft_task310_checkpoint_salvage_review_s1,ROLE=worker,TEAM_ID=nemotron -->
3+
<!-- METADATA:STATUS=ReadyForPR,TASK=task321_qwen_all_sft_closeout_merge_runbook_s1,ROLE=worker,TEAM_ID=nemotron -->
44

55
| Field | Value |
66
|------|-----|
77
| Name | intern_nemotron_worker_4 |
88
| Status | ReadyForPR |
99
| Role | worker |
1010
| Team | nemotron |
11-
| Current Task | task313_qwen_all_sft_task310_checkpoint_salvage_review_s1 |
12-
| PR | #376 |
11+
| Current Task | task321_qwen_all_sft_closeout_merge_runbook_s1 |
12+
| PR | pending |
1313
| Session | 1 |
14-
| Progress | Refreshed task313 review for #373 exact head `0cbcb3c56df5f097a0fd63ebfa1a3c7cdb36f9b8` using lead docs `c085e1693a4fca9e4444fb64a85ab0193b03d3ce`. Completed read-only artifact/checksum/termination review and updated #376 report with disposition `APPROVE_SALVAGE_HANDOFF_TO_TASK311_LOAD_CANARY_ONLY`: full remote `iter_0000035` payload checksum passed for all 28 files, key local/remote manifests matched, training log shows 35 finite iterations with skipped/nan 0, and SIGTERM/rc=1 validation-hang residuals are documented. This is not `PASS_TRAINING` and authorizes no benchmark/AIME eval, export, endpoint, promotion, additional training, task255, AIME2025 train data, shared deletion, merge, or main push. |
14+
| Progress | Produced task321 read-only closeout merge/runbook sequencing report from lead docs `479fe4c1df950ad441c2c6431792be06a7cc3ef6` and current `origin/main` `292c5bfabf1f5b14e3330e0be72b4ef9abdc4aeb`. Reviewed #371 `fc85b866`, #377 `c1b053b`, #378 `df561ea`, #379 `89cc7f7`, and #380 `9e57390`; all were open/base main/non-draft/CLEAN/MERGEABLE at final recheck, with diffs limited to task/status docs or task-owned scripts and diff-check clean. Disposition `APPROVE_RUNBOOK`: support docs #378/#380/#379, then #371 evidence/fail-closeout docs, then #377 repair plan docs, all via coordinator/authorized non-author merge only. task318-task320 are only assigned/no visible PRs; allowed next actions are no-training validation preflight, raw blend/decontam feasibility, and MMLU data-repair linkage only. No merge, self-merge, main push, training, eval, pack, export, endpoint, promotion, task255 reuse, AIME2025 train data, or shared deletion. |
Lines changed: 76 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -0,0 +1,76 @@
1+
# task321_qwen_all_sft_closeout_merge_runbook_s1 - All-SFT closeout merge/runbook sequencing
2+
3+
<!-- METADATA:STATUS=ReadyForPR,ASSIGNEE=intern_nemotron_worker_4,SESSION=1 -->
4+
5+
## Background
6+
7+
The all-SFT evidence/follow-up PR set is open and clean:
8+
9+
- #371 task311 evidence/fail-closeout docs;
10+
- #377 task316 repair plan docs;
11+
- #378 task317 independent #371 closeout review;
12+
- #379 task315 M1 runtime blocker docs;
13+
- #380 task314 MMLU-Pro forensics docs.
14+
15+
The current boundary requires coordinator/authorized non-author merge. No
16+
worker self-merge is allowed.
17+
18+
## Goal
19+
20+
Produce a merge/runbook sequencing recommendation for the documentation PR set
21+
and the next lead-gated repair tasks, without merging or changing PR branches.
22+
23+
## Scope
24+
25+
- Review current PR heads and dependencies.
26+
- Recommend merge ordering or hold conditions for #371/#377/#378/#379/#380.
27+
- Confirm which PRs are evidence/fail-closeout docs, blocker docs, or planning
28+
docs.
29+
- Update the runbook state for what is allowed next:
30+
validation/termination preflight, raw blend/decontam feasibility, and
31+
data-repair linkage analysis only.
32+
- Identify any PR that should stay hold due stale head, wording, or dependency.
33+
34+
## Boundaries
35+
36+
- Read-only review/docs only.
37+
- Do not merge, self-merge, push main, train, eval, pack, export, endpoint,
38+
promote, reuse task255, use AIME2025 train data, or delete shared files.
39+
40+
## Expected Output
41+
42+
- Worker branch:
43+
`intern_nemotron_worker_4/task321_qwen_all_sft_closeout_merge_runbook_s1`.
44+
- Report:
45+
`workspace/tasks/task321_qwen_all_sft_closeout_merge_runbook_s1/closeout_merge_runbook_report.md`.
46+
- Mailbox report with branch/head/PR or blocker, PR ordering, hold conditions,
47+
and next-task runbook.
48+
49+
## Acceptance Criteria
50+
51+
- `APPROVE_RUNBOOK`: sequencing is concrete and preserves all no-promotion and
52+
no-self-merge boundaries.
53+
- `REQUEST_CHANGES`: dependency/order or residual risk is incomplete.
54+
- `BLOCK`: PR state is stale/conflicting or merge sequencing cannot be safely
55+
recommended.
56+
57+
## Assignment
58+
59+
- Team: `nemotron`
60+
- Team lead: `intern_nemotron_lead`
61+
- Worker: `intern_nemotron_worker_4`
62+
- Current main: `292c5bfabf1f5b14e3330e0be72b4ef9abdc4aeb`
63+
- Inputs: #371, #377, #378, #379, #380, task318-task320
64+
- Gate state: no merge by worker; no runtime action.
65+
66+
## Worker Closeout Snapshot
67+
68+
- Report: `workspace/tasks/task321_qwen_all_sft_closeout_merge_runbook_s1/closeout_merge_runbook_report.md`.
69+
- Disposition: `APPROVE_RUNBOOK`.
70+
- Current PR sequencing recommendation: support docs #378/#380/#379, then #371
71+
evidence/fail-closeout docs, then #377 repair plan docs, all through
72+
coordinator/authorized non-author merge only and only while exact heads remain
73+
clean/mergeable.
74+
- Next repair work remains limited to task318 validation/exit preflight,
75+
task319 raw blend/decontam feasibility, and task320 MMLU data-repair linkage;
76+
no runtime or promotion action is released.
Lines changed: 129 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -0,0 +1,129 @@
1+
# task321 closeout merge/runbook report
2+
3+
## Disposition
4+
5+
Recommendation: `APPROVE_RUNBOOK`.
6+
7+
This is a read-only sequencing review for #371/#377/#378/#379/#380 and
8+
task318-task320. It does not authorize any worker self-merge, direct main push,
9+
training, evaluation, packing, export, endpoint launch, promotion, task255
10+
reuse, AIME2025 train-data use, or shared deletion.
11+
12+
## Review Snapshot
13+
14+
Observed at `2026-06-03T19:44:34Z`.
15+
16+
| Item | Exact state reviewed |
17+
| --- | --- |
18+
| Worker branch | `intern_nemotron_worker_4/task321_qwen_all_sft_closeout_merge_runbook_s1` |
19+
| Branch base | `origin/main` `292c5bfabf1f5b14e3330e0be72b4ef9abdc4aeb` |
20+
| Lead docs | `origin/intern_nemotron_lead/session1-recovery-task-docs` `479fe4c1df950ad441c2c6431792be06a7cc3ef6` |
21+
| PR scope | docs/runbook review only |
22+
23+
## PR Matrix
24+
25+
| PR | Current head | State | Scope classification | Review result |
26+
| --- | --- | --- | --- | --- |
27+
| #371 task311 | `fc85b866ede0cdc95f31b6fcd6d61b817ceb2de8` | `OPEN`, base `main`, non-draft, `CLEAN`, `MERGEABLE` | task311 evidence/fail-closeout docs plus task-owned task311 scripts | Accept as evidence/fail-closeout docs only if coordinator/authorized non-author merge path is used. Current drift from task317-reviewed `9361e6da3ee6718c9ec5aa7f97b60a75c8e332b6` is status/history/task_knowledge-only with diff-check clean. |
28+
| #378 task317 | `df561ea93e696d8e704d4e969e2da83b719185f7` | `OPEN`, base `main`, non-draft, `CLEAN`, `MERGEABLE` | independent review of #371 closeout | Mergeable as review docs only. It supports #371 merge-as-evidence/fail-closeout docs and authorizes no promotion or further runtime action. |
29+
| #380 task314 | `9e57390bb33365157b73a8c93264b9dd57a2d489` | `OPEN`, base `main`, non-draft, `CLEAN`, `MERGEABLE` | MMLU-Pro regression forensics docs | Mergeable as forensics docs only. It preserves `FAIL_MMLU_PRO_BELOW_BASE_WITH_AIME_HMMT_PASS`; no new eval or promotion. |
30+
| #379 task315 | `89cc7f74a737f174f4b8dbf9129c712fabbafa95` | `OPEN`, base `main`, non-draft, `CLEAN`, `MERGEABLE` on recheck | M1 launcher runtime blocker docs | Mergeable as blocker docs only. It confirms `BLOCK_RUNTIME` for M1 launcher rows; no M1 row execution is authorized. |
31+
| #377 task316 | `c1b053b518137769b9b423d08d9590d8ae481a2e` | `OPEN`, base `main`, non-draft, `CLEAN`, `MERGEABLE` | repair candidate plan docs | Mergeable only after the closeout/support docs are sequenced or explicitly accepted by lead. It recommends data plus validation repair before any later 30B training and authorizes no action by itself. |
32+
33+
All five PR diffs were checked with `git diff --name-status` and `git diff
34+
--check` against `origin/main`. The diffs are limited to worker status files,
35+
task-specific docs, and task-owned scripts under their task directories; no
36+
product code was modified by these PRs.
37+
38+
## Recommended Merge Sequence
39+
40+
Use coordinator/authorized non-author merge only. Before each merge, recheck
41+
the exact head, base `main`, non-draft state, and `CLEAN`/`MERGEABLE` status.
42+
43+
1. Merge #378, #380, and #379 as supporting review/forensics/blocker docs.
44+
These may be merged in any order if their exact heads remain unchanged and
45+
clean. They provide the independent review, MMLU-Pro forensics, and M1
46+
runtime blocker context for #371.
47+
2. Merge #371 as the task311 evidence/fail-closeout record only after the
48+
support set is accepted or explicitly scheduled by lead. Current #371 head
49+
`fc85b866` is acceptable because the drift from reviewed head `9361e6da`
50+
only updates status/history/task_knowledge and does not change the benchmark
51+
evidence, scripts, metrics, or artifact claims.
52+
3. Merge #377 last as the repair-plan/runbook docs, once #371/#378/#379/#380
53+
are merged or lead explicitly accepts the plan against the same evidence
54+
set. #377 should remain docs-only and must not be treated as release for a
55+
repair run.
56+
57+
## Hold Conditions
58+
59+
Hold and request refresh if any of the following occur:
60+
61+
- Any PR head changes materially outside status/history/task_knowledge
62+
bookkeeping.
63+
- Any PR becomes draft, stale, dirty, conflicting, closed unexpectedly, or not
64+
mergeable.
65+
- #371 changes benchmark evidence, runner scripts, artifact hashes, or metrics
66+
beyond the verified metadata-only drift.
67+
- #377 changes from a plan into an execution request, or implies immediate
68+
training, packing, export, endpoint, promotion, or benchmark release.
69+
- #379 loses the `CLEAN`/`MERGEABLE` state or changes its blocker conclusion.
70+
- New task318-task320 evidence contradicts the closeout facts before #377 is
71+
merged.
72+
73+
## Next Repair Runbook
74+
75+
At this snapshot no remote worker branches or PRs were visible for
76+
task318-task320; only lead assignment docs were visible on the lead branch.
77+
The next allowed work is limited to these no-runtime/no-promotion tasks:
78+
79+
| Task | Allowed next action | Stop conditions |
80+
| --- | --- | --- |
81+
| task318 validation/exit repair preflight | Review task310 configs/logs and propose a no-training validation or explicit-skip handoff route with exact config keys, rc policy, timeout policy, checkpoint marker policy, and teardown proof. Optional import/config dry-run only if it has no optimizer step and no eval. | Stop if product-code changes are required, any optimizer/eval/export/endpoint action would be needed, or rc/timeout/checkpoint policy cannot be made explicit. |
82+
| task319 raw blend/decontam feasibility | Audit `stage1_sft/data_blend_raw` sources, materialization status, counts, checksums, supervised-token feasibility, and heldout/decontam plan. Lightweight task-owned probes only; no final packing. | Stop on missing source identity/revision/counts/checksums/decontam proof, forbidden AIME2025 train-row use, task255 reuse, shared mutation, or undefined large downloads. |
83+
| task320 MMLU data-repair linkage | Map task314 MMLU-Pro row/category drift to concrete data-repair constraints using task314 plus task308/task309 evidence. Coordinate with task319 outputs if available. | Stop if task314/task308/task309 evidence is unavailable or contradictory, or if linkage requires new eval, data materialization, packing, or training. |
84+
85+
No later 30B repair training, packing, export, endpoint, benchmark eval,
86+
promotion, or go/no-go can be inferred from task321 or the closeout PR set.
87+
Those require separate lead-gated tasks after task318-task320 produce accepted
88+
evidence.
89+
90+
## Commands And Checks
91+
92+
```bash
93+
git fetch origin main intern_nemotron_lead/session1-recovery-task-docs \
94+
+pull/371/head:refs/remotes/origin/pr/371 \
95+
+pull/377/head:refs/remotes/origin/pr/377 \
96+
+pull/378/head:refs/remotes/origin/pr/378 \
97+
+pull/379/head:refs/remotes/origin/pr/379 \
98+
+pull/380/head:refs/remotes/origin/pr/380
99+
git rev-parse origin/main
100+
git rev-parse origin/intern_nemotron_lead/session1-recovery-task-docs
101+
gh pr view 371 --json number,state,isDraft,baseRefName,headRefName,headRefOid,mergeStateStatus,mergeable,url,title
102+
gh pr view 377 --json number,state,isDraft,baseRefName,headRefName,headRefOid,mergeStateStatus,mergeable,url,title
103+
gh pr view 378 --json number,state,isDraft,baseRefName,headRefName,headRefOid,mergeStateStatus,mergeable,url,title
104+
gh pr view 379 --json number,state,isDraft,baseRefName,headRefName,headRefOid,mergeStateStatus,mergeable,url,title
105+
gh pr view 380 --json number,state,isDraft,baseRefName,headRefName,headRefOid,mergeStateStatus,mergeable,url,title
106+
git diff --name-status origin/main...origin/pr/371
107+
git diff --name-status origin/main...origin/pr/377
108+
git diff --name-status origin/main...origin/pr/378
109+
git diff --name-status origin/main...origin/pr/379
110+
git diff --name-status origin/main...origin/pr/380
111+
git diff --check origin/main...origin/pr/371
112+
git diff --check origin/main...origin/pr/377
113+
git diff --check origin/main...origin/pr/378
114+
git diff --check origin/main...origin/pr/379
115+
git diff --check origin/main...origin/pr/380
116+
git diff --name-status 9361e6da3ee6718c9ec5aa7f97b60a75c8e332b6..origin/pr/371
117+
git diff --check 9361e6da3ee6718c9ec5aa7f97b60a75c8e332b6..origin/pr/371
118+
git ls-remote --heads origin '*task318*'
119+
git ls-remote --heads origin '*task319*'
120+
git ls-remote --heads origin '*task320*'
121+
gh pr list --state all --search "task318 OR task319 OR task320 in:title" \
122+
--json number,state,isDraft,baseRefName,headRefName,headRefOid,mergeStateStatus,mergeable,title,url
123+
```
124+
125+
## Boundary Confirmation
126+
127+
I did not merge, self-merge, push main, train, evaluate, pack, export, launch an
128+
endpoint, promote, reuse task255, use AIME2025 train data, or delete shared
129+
files. The task321 output is a docs/runbook review only.
Lines changed: 37 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -0,0 +1,37 @@
1+
# task321_qwen_all_sft_closeout_merge_runbook_s1 - History Log
2+
3+
<!-- METADATA:SESSION=1 -->
4+
5+
## Session 78 - 2026-06-03 UTC - Assigned
6+
7+
- Created by `intern_nemotron_lead` after follow-up PRs #371/#377/#378/#379/#380
8+
reached current-head gate comments.
9+
- Assigned to `intern_nemotron_worker_4`.
10+
- Scope is closeout merge/runbook sequencing only; no merge or runtime action is
11+
authorized.
12+
13+
## Session 1 - 2026-06-03 UTC - Produced closeout merge/runbook review
14+
15+
- Created worker branch
16+
`intern_nemotron_worker_4/task321_qwen_all_sft_closeout_merge_runbook_s1`
17+
from `origin/main` `292c5bfabf1f5b14e3330e0be72b4ef9abdc4aeb`.
18+
- Fetched lead docs branch
19+
`origin/intern_nemotron_lead/session1-recovery-task-docs` at
20+
`479fe4c1df950ad441c2c6431792be06a7cc3ef6`.
21+
- Reviewed current PR states and diffs for #371/#377/#378/#379/#380. Exact
22+
heads reviewed: #371 `fc85b866ede0cdc95f31b6fcd6d61b817ceb2de8`, #377
23+
`c1b053b518137769b9b423d08d9590d8ae481a2e`, #378
24+
`df561ea93e696d8e704d4e969e2da83b719185f7`, #379
25+
`89cc7f74a737f174f4b8dbf9129c712fabbafa95`, #380
26+
`9e57390bb33365157b73a8c93264b9dd57a2d489`.
27+
- Verified all five PR diffs are task/status docs or task-owned scripts only
28+
and `git diff --check` is clean.
29+
- Verified #371 drift from task317-reviewed head `9361e6da` to current
30+
`fc85b866` is status/history/task_knowledge-only with no benchmark evidence
31+
change.
32+
- Checked task318-task320 visibility: no remote worker branches or PRs were
33+
visible; lead assignment docs exist on the lead branch.
34+
- Added `closeout_merge_runbook_report.md` with disposition `APPROVE_RUNBOOK`.
35+
- Did not merge, self-merge, push main, train, evaluate, pack, export, launch
36+
endpoint, promote, reuse task255, use AIME2025 train data, or delete shared
37+
files.
Lines changed: 27 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -0,0 +1,27 @@
1+
# task321_qwen_all_sft_closeout_merge_runbook_s1 - Task Knowledge
2+
3+
<!-- METADATA:SESSION=1 -->
4+
5+
## Knowledge Entries
6+
7+
1. #371/#377/#378/#379/#380 are documentation/evidence PRs, not promotion or
8+
runtime-action authorizations.
9+
2. Current boundary requires coordinator/authorized non-author merge; no worker
10+
self-merge.
11+
3. Next repair work remains no-training/no-eval until later explicit gate.
12+
4. Current reviewed heads are #371
13+
`fc85b866ede0cdc95f31b6fcd6d61b817ceb2de8`, #377
14+
`c1b053b518137769b9b423d08d9590d8ae481a2e`, #378
15+
`df561ea93e696d8e704d4e969e2da83b719185f7`, #379
16+
`89cc7f74a737f174f4b8dbf9129c712fabbafa95`, and #380
17+
`9e57390bb33365157b73a8c93264b9dd57a2d489`.
18+
5. #371 current drift from task317-reviewed `9361e6da` is
19+
status/history/task_knowledge-only; task311 metrics and artifact claims
20+
remain `AIME2025 +1`, `HMMT +2`, `MMLU-Pro -2`, with M1 launcher rows
21+
blocked.
22+
6. Recommended merge sequence is support docs #378/#380/#379 first, then #371
23+
evidence/fail-closeout docs, then #377 repair plan docs, all through
24+
coordinator/authorized non-author merge only.
25+
7. task318-task320 were visible only as lead assignment docs at review time.
26+
Allowed next actions are validation/termination preflight, raw
27+
blend/decontam feasibility, and MMLU data-repair linkage analysis only.

0 commit comments

Comments
 (0)