Date: 2026-05-15
Repo: /Users/stefan/ShyftR
Recorded: 2026-05-15 21:33:00 AEST
Status: ready to start from a fully verified Phase 8 closeout
Resume from this exact truth.
Canonical predecessor closeout:
/Users/stefan/ShyftR/2026-05-15-shyftr-phase-8-evaluation-track-closeout.md
Canonical predecessor planning artifacts:
/Users/stefan/ShyftR/2026-05-15-shyftr-phase-8-evaluation-track-tranched-plan.md/Users/stefan/ShyftR/2026-05-15-shyftr-phase-8-evaluation-track-handoff-packet.md
-
Phase 8 (Evaluation Track) is complete locally.
- evaluation bundle runner exists and is CLI-addressable;
- ablation report generator exists with explicit measured vs deferred rows;
- latency/throughput contract generator exists with local-only caveats;
- frontier-readiness report generator exists and assembles the required sections;
- generated Phase 8 status artifacts exist under
docs/status/.
-
Full repo verification was rerun after the Phase 8 implementation.
PYTHONPATH=.:src python -m compileall -q src scripts examplespython scripts/terminology_inventory.py --fail-on-public-stalepython scripts/terminology_inventory.py --fail-on-capitalized-prosepython scripts/public_readiness_check.pygit diff --checkPYTHONPATH=.:src pytest -q- result:
1003 passed, 31 warnings
-
Phase 8 generated artifacts are on disk:
docs/status/phase-8-evaluation-bundle/evaluation-bundle.jsondocs/status/phase-8-evaluation-track-ablation-report.jsondocs/status/phase-8-evaluation-track-ablation-report.mddocs/status/phase-8-evaluation-track-latency-contract.jsondocs/status/phase-8-evaluation-track-latency-contract.mddocs/status/phase-8-evaluation-track-frontier-readiness-report.jsondocs/status/phase-8-evaluation-track-frontier-readiness-report.md
There is no canonical Phase 9 defined in broad-roadmap-concept.md after the Phase 8 section.
That means the repo is Phase-9-ready in the operational sense, but the next phase scope is still undefined and must not be invented implicitly.
Start Phase 9 with planning truth, not implementation drift.
Ordered continuation sequence:
- Re-read:
/Users/stefan/ShyftR/2026-05-15-shyftr-phase-8-evaluation-track-closeout.md/Users/stefan/ShyftR/broad-roadmap-concept.md/Users/stefan/ShyftR/docs/status/current-implementation-status.md
- Confirm whether the user wants:
- a new canonical
Phase 9plan carved from backlog/research truth, or - a broader roadmap refresh before naming Phase 9.
- a new canonical
- Land the smallest canonical next artifact first:
- either
2026-05-15-shyftr-phase-9-tranched-plan.md, or - a roadmap-refresh artifact that explicitly defines what Phase 9 should be.
- either
- Do not open code implementation until that new phase boundary exists on disk.
Do not redo:
- Phase 8 implementation work;
- Phase 8 verification work;
- evaluation-track artifact generation unless the next plan explicitly depends on refreshed measurements.
Do not assume:
- that
Phase 9already has a canonical name; - that external benchmarks are automatically the next step;
- that hosted/production scope is now open.
ShyftR is ready for Phase 9 because Phase 8 is complete and fully verified, but the next phase must begin with a canonical planning artifact because the broad roadmap does not yet define a Phase 9 scope.