Phase 1: enforce configured sources across non-Fanfic retrieval - #18
Draft
hiidkaboutyou-spec wants to merge 11 commits into
Draft
Phase 1: enforce configured sources across non-Fanfic retrieval#18hiidkaboutyou-spec wants to merge 11 commits into
hiidkaboutyou-spec wants to merge 11 commits into
Conversation
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Phase 1 — project-wide configured-sources-only audit
Base verified before work:
mainat41191ca2fe602df161db1628c56b17d8a6e14532(merged PR #16).This draft extends PR #16's source authority from automatic Daily collection to every reachable non-Fanfic production retrieval/replay boundary:
Fanfic/AO3 is explicitly unchanged and remains independent. No Event Fusion, Rust, Supabase, hosting redesign, translation redesign, or public Telegram publishing is included.
Confirmed baseline violations and the full entrypoint inventory are documented in
docs/audit/CONFIGURED_SOURCES_ONLY_PHASE1.md.Do not merge until all canonical CI gates are green on the exact final HEAD. This PR must remain draft for the Phase 1 audit task.