Skip to content

Move fixtures into conftest #28

Move fixtures into conftest

Move fixtures into conftest #28

Triggered via pull request January 9, 2026 02:43
Status Failure
Total duration 49s
Artifacts

ci.yaml

on: pull_request
Matrix: lint
Fit to window
Zoom out
Zoom in

Annotations

7 errors
lint (3.11)
Process completed with exit code 1.
lint (3.10)
The strategy configuration was canceled because "lint._3_11" failed
lint (3.10)
The operation was canceled.
lint (3.8)
The strategy configuration was canceled because "lint._3_11" failed
lint (3.8)
The operation was canceled.
lint (3.9)
The strategy configuration was canceled because "lint._3_11" failed
lint (3.9)
The operation was canceled.